| 000 | nam a22 7a 4500 | ||
|---|---|---|---|
| 999 |
_c3442 _d3442 |
||
| 005 | 20230726121020.0 | ||
| 008 | 230726b xxu||||| |||| 00| 0 eng d | ||
| 040 |
_aSLIDA _cSLIDA _dSLIDA |
||
| 086 |
_2SLIDA _aMPM/T/167 |
||
| 245 |
_aA STUDY OF THE EFFECTS OF COST AND TIME OVERRUN ON THE PERFORMANCE OF ROAD REHABILITATION PROJECTS IN SRI LANKA _cPiyaseeli, K A. _heng. |
||
| 300 |
_axii, 96p.: _c30cm. |
||
| 500 | _aWijekoon, W M M G D. & Arumugam, E. | ||
| 942 |
_2ddc _cMPM-THESIS |
||