| 000 | nam a22 7a 4500 | ||
|---|---|---|---|
| 999 |
_c3407 _d3407 |
||
| 005 | 20230725120832.0 | ||
| 008 | 230725b xxu||||| |||| 00| 0 eng d | ||
| 040 |
_aSLIDA _cSLIDA _dSLIDA |
||
| 041 | _aeng. | ||
| 086 |
_2SLIDA _aMPM/T/140 |
||
| 245 |
_aA STUDY ON THE IMPACT OF PROCRUEMENT PROCEDURE ON THE PERFORMANCE OF WORLD BANK FUNDED IRQUE PROJECT - SPECIAL REFERENCE TO THE UNIVERSITY OF MORATUWA _cPushpakeerthi, K A D. _heng. |
||
| 300 |
_aix, 70p.: _c30cm. |
||
| 500 | _aWijekoon, W M M G D. & Arumugam, E. | ||
| 942 |
_2ddc _cMPM-THESIS |
||