000 nam a22 7a 4500
999 _c3407
_d3407
005 20230725120832.0
008 230725b xxu||||| |||| 00| 0 eng d
040 _aSLIDA
_cSLIDA
_dSLIDA
041 _aeng.
086 _2SLIDA
_aMPM/T/140
245 _aA STUDY ON THE IMPACT OF PROCRUEMENT PROCEDURE ON THE PERFORMANCE OF WORLD BANK FUNDED IRQUE PROJECT - SPECIAL REFERENCE TO THE UNIVERSITY OF MORATUWA
_cPushpakeerthi, K A D.
_heng.
300 _aix, 70p.:
_c30cm.
500 _aWijekoon, W M M G D. & Arumugam, E.
942 _2ddc
_cMPM-THESIS